The library building (main and lower levels) will be closed Monday, March 2 – Saturday, March 14. Staff will be working in the building so you can pick up holds and return materials to the library. During this closure, moving crews and library staff will shift furniture and materials and set up for the public to return to the newly renovated phase 2 area of the Library. Renovations to the flooring in the lobby will also take place during this time.
During normal library hours you can:
  • Pick up your holds by ringing the doorbell at the main library entrance off the parking lot.
  • Returns materials in the outside slot on the Union Street side of the building. Due dates will be extended.
  • Please look for signs directing you to both locations.
  • Connect to extended wifi outside the perimeter of the building stretching to the parking lot and street
The library will open back up to the public on Monday, March 16.